(07:55) Big Sur – A ribbon cutting ceremony is scheduled to take place for the reopening of the Pfeiffer Canyon Bridge this month. Crews have been working for the last 8 months to rebuild 310 foot long bridge. Caltrans announced that the bridge is scheduled to reopen at 5 p.m. on Friday, October 13.