Donate Advertising Contact

Highway 17 Storm Repair To Begin 04/26/17B 21:04 S.S.

Storm  repair  is  scheduled  to  begin again Sunday night  on  Highway 17.    This  time  workers  will  be  constructing  a  soil nail  wall  (to repair eroded  slopes)  on  the  southbound  side  of  the  roadway  south  of  East  Main Street  in  Los  Gatos.   1  lane  is  slated  to  be  closed  between  10 p.m.  and  5  a.m.  on  weekdays,  and  between  midnight  and  7  a.m.  on  weekends.     Changeable  message  signs  are  scheduled  to be  in place  to  alert  drivers  to the roadwork.    Motorists are advised to use caution when traveling through the area and please “slow

For the cone zone.”

Leave a Reply

Your email address will not be published. Required fields are marked *