9 CLOSED AND POWER OUTAGE IN B L - 11/13/12 0700 S.S.
MORE THAN 150 P.G. & E. CUSTOMERS ARE WITHOUT POWER IN THE BEN LOMOND AREA, AND HIGHWAY 9 IS CLOSED. THAT AFTER A VEHICLE HIT A POWER POLE JUST AFTER 4 O’CLOCK THIS MORNING. THE ACCIDENT OCCURRED ON HIGHWAY 9 AT UPPER GLEN ARBOR ROAD, AND DUE TO THE FACT THAT THE OTHER LANE WAS ALREADY CLOSED FOR ROADWORK, NO TRAFFIC IS GETTING THROUGH THAT AREA ON HIGHWAY 9. THE C.H.P. IS RE-ROUTING PEOPLE DOWN GLEN ARBOR ROAD.







