Donate Advertising Contact

Gonzales Well # 5 Off-Line 11/08/17B 16:20 S.S.

A  well,  that  serves  the  city  of Gonzales,  has  been  taken  off-line  due  to elevated  levels  of  coliform  bacteria.     Although  that  particular  bacteria  is  not  considered  harmful,   it  is  usually  a  sign  there  could  be  a  problem  with  the  system’s  treatment  or  distribution  system.  Well number  5  (on  Fanoe  Road)  is   being  repaired,   and  is  expected  to  be  back  in  service  by  November  30th.  

Leave a Reply

Your email address will not be published. Required fields are marked *