Lieberman Show

News

TALL SHIP AT MOSS LANDING S.S.

A TALL SHIP, THAT IS A REPLICA OF THE 89-FOOT SHIP ?THE LADY WASHINGTON? (WHICH WAS BUILT IN 1750) IS IN PORT IN MOSS LANDING. THE ORIGINAL 90-TON VESSEL SERVED AS A MERCHANT SHIP THAT TRADED WITH NATIVE AMERICANS ALONG THE NORTHWEST COAST. NOWADAYS THOUGH, THE REPLICA TALL SHIP IS OPERATED BY THE GRAYS HARBOR HISTORICAL SEAPORT AUTHORITY IN ABERDEEN WASHINGTON?..AND THE 16 MEMBER CREW HOSTS EDUCATIONAL TOURS THROUGH THE SHIP WHILE IN PORT?..AS WELL AS TAKING PEOPLE OUT TO SEA. THE DOCKSIDE AND SEA TOURS ARE FROM 4 - 5 P.M. ON WEEKDAYS. ON THE WEEKEND THE DOCKSIDE TOURS ARE FROM 10 A.M. UNTIL 1 P.M. AND THE SEA TOURS WILL TAKE PLACE FROM 2 - 5 P.M. ON SATURDAY AND SUNDAY. THE SHIP WILL BE IN THE MOSS LANDING AREA THROUGH MONDAY.

QUAKES IN AREA (and around CA) S.S.

A minor earthquake occurred at 3:42 this morning. The magnitude 3.4 event occurred 4 miles NW of Kettleman City, CA, at a hypocentral depth 14 miles.

That followed another minor earthquake that took place at 8:58 PM last night. that magnitude 3.1 event occurred 8 miles S of Tres Pinos, CA, at a hypocentral depth of 3 miles.

And still in the area around California?.but this time off the coast
56 miles WSW of Eureka, CA

A minor earthquake occurred at 1:47 this morning. The magnitude 3.8 event was epi-centered at a hypocentral depth of about 5 miles.

TRANSFORMER FAILED S.S.

96 HUNDRED P.G & E. CUSTOMERS IN SANTA CRUZ WERE WITHOUT POWER FOR A WHILE LAST NIGHT AFTER A TRANSFORMER FAILED. THE POWER WENT OUT AROUND 5:40 P.M., AND EVERYONE HAD THEIR ELECTRICITY BACK BY 7:10 P.M. LAST NIGHT.

ARRESTED ON DRUG CHARGES S.S

A MARINA MAN HAS BEEN ARRESTED ON DRUG CHARGES. THAT AFTER 26 YEAR-OLD KHALIK KAREEM KENNEDY WAS FOUND TO HAVE COCAINE, ECSTASY, MUSHROOMS AND MARIJUANA ALL PACKAGED FOR SALE AT HIS HOME. KENNEDY, WHO IS A PAROLEE, WAS BOOKED INTO MONTEREY COUNTY JAIL, WHERE HE IS BEING HELD WITHOUT BAIL.

HORSE PARK ON FORT ORD S.S.

A TIMELINE HAS BEEN ESTABLISHED FOR THE CONSTRUCTION OF A 390-ACRE HORSE PARK ON THE FORMER FORT ORD. TO KEEP THE NEW TIMELINE AGREEMENT, THE HORSE PARK GROUP MUST RAISE HALF A MILLION DOLLARS BY THE END OF JANUARY. THAT?S BECAUSE THEY HAVE TO CARRY OUT THE NECESSARY ENVIRONMENTAL DOCUMENTATION FOR THE SITE IN THE PARKER FLATS AREA, (NORTH OF THE PARKER FLATS CUT-OFF IN SEASIDE). THE BOARD PRESIDENT OF THE GROUP SAYS HE IS CONFIDENT THEY CAN RAISE THE MONEY IN TIME.

Sign Up for the Weekly Newsletter

Your mail*
Your name*


Podcasts

Advertising

Local News

2300 Portola Drive, Santa Cruz, CA