Crews are currently excavating loose soil, and filling holes with large rocks, alongside the Pajaro River….to try and repair some of the damage caused by the Winter Storms of 2017. The work will be done in 17 locations that are along the Pajaro River Levee System; Salsipuedes Creek; Murphy’s Crossing; HIghway 1; and Highway 152. They hope to complete this 6.4 million dollar project in October.